Lac des Iles

In late 2011, Dumas commenced shaft sinking at Lac des Iles, near Thunder Bay, Ontario. 
 
The project involved a 1,000m long, 6.0m diameter concrete-lined shaft with permanent installations. Dumas successfully completed the project to a final depth of 1,500m, including conveyances, compartments, and conveyor drift excavation. 

Scope of Work 

  • 1,500m x 6.0m diameter concrete-lined shaft 
  • Shaft furnishings and permanent installations 
  • Conveyor drift excavation and construction 